-
Southsea Costal Defence Scheme
1 Million Tonnes of Shingle managed and placed at SouthseaSouthsea Costal Defence Scheme
1 Million Tonnes of Shingle managed and placed at SouthseaRead Story -
Emergency Works - Bognor Regis Storm Drain
Emergency Storm Drain Works at Bognor RegisEmergency Works - Bognor Regis Storm Drain
Emergency Storm Drain Works at Bognor RegisRead Story -
Easton Reservoirs, Chichester
Construction and Lining two reservoirs with a capacity of 105000m3Easton Reservoirs, Chichester
Construction and Lining two reservoirs with a capacity of 105000m3Read Story -
Little Sefter Reservoirs, Barfoots, Chichester
Construction and Lining of Reservoir, Capacity 125,000,000 litresLittle Sefter Reservoirs, Barfoots, Chichester
Construction and Lining of Reservoir, Capacity 125,000,000 litresRead Story -
Read Story
-
Barton Farm Winchester
As part of the new Barton Farm housing development to build 2,000 new homes at Winchester in Hampshire Les Searle secured the earthworks contract for the principal site at the southern end of the development.Barton Farm Winchester
As part of the new Barton Farm housing development to build 2,000 new homes at Winchester in Hampshire Les Searle secured the earthworks contract for the principal site at the southern end of the development.Read Story -
Larkhill SFA
200,000m3 of excavation and engineered fill at MOD facility for 450 homes.Larkhill SFA
200,000m3 of excavation and engineered fill at MOD facility for 450 homes.Read Story -
Perham Down
150,000m3 cut and fill, excavate and remediation of asbestos contaninated ground.Perham Down
150,000m3 cut and fill, excavate and remediation of asbestos contaninated ground.Read Story -
Hayling Island, Beach Recycling
Beach Recycling At Hayling Island.Hayling Island, Beach Recycling
Beach Recycling At Hayling Island.Read Story -
Tidworth, Bulford & Ludgershall MOD facilities in Wiltshire
Restoration and material relocation with 22000 miles being covered using 40t ADTs over a 2 month periodTidworth, Bulford & Ludgershall MOD facilities in Wiltshire
Restoration and material relocation with 22000 miles being covered using 40t ADTs over a 2 month periodRead Story
