Tidworth, Bulford & Ludgershall MOD facilities in Wiltshire
Restoration and material relocation with 22000 miles being covered using 40t ADTs over a 2 month periodRead Story -
Larkhill
200,000m3 Cut and fill engineering working with archaeologists and an ordinance watch and brief during a 3 year contractRead Story -
Perham Down
150,000m3 cut and fill, excavate and remediation of asbestos contaninated ground.Read Story -
Easton Farm
Construction and Lining two reservoirs with a capacity of 105000m3Read Story -
Hayling Island
The first phase of beach management activities for 2018/19 was carried out during October 2018.Read Story -
Barton Farm Winchester
As part of the new Barton Farm housing development to build 2,000 new homes at Winchester in Hampshire Les Searle secured the earthworks contract for the principal site at the southern end of the development.Read Story -
Larkhill SFA
200,000m3 of excavation and engineered fill at MOD facility for 450 homes.Read Story -
Heavy Haulage and Transport
Les Searle Group have a long history with heavy haulage and transport spanning over 70 years. Our specialist heavy haulage division operate a modern fleet with the ability to move 110 tonne loads. Les Searle Group Haulage Division is accredited with FORS Silver and comply with Clocs, Crossrail, LEZ and Direct Vision . WithRead Story